Aluminum Extruded Outdoor Platform MOD AL-055ap Low-poly 3D model
Home Catalog Aluminum Extruded Outdoor Platform MOD AL-055ap Low-poly 3D model

Publication date: 2023-05-27

Buy Aluminum Extruded Outdoor Platform MOD AL-055ap Low-poly 3D model

$14

License: Royalty Free

author:

AnyKolab

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «AnyKolab». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Product Name: Aluminum Extruded Outdoor Platform MOD AL-055ap

Product Details

Product Size: W = 178 mm., L = 100 mm., H = 18 mm.

Polygons : 2438

Vertices : 3374

Files units : Millimeters

Software : Solidworks 2021

Additional file formats : .igs / .stp / .stl / .obj / .fbx / .3mf

Uploaded: May 27th, 2023

If you have any question don’t hesitate to contact me.

Thank you for purchasing 3D

SLDPRT (SolidWorks, filesize: 336 KB), OBJ (OBJ, filesize: 32.5 KB), FBX (Autodesk FBX, filesize: 78.9 KB), PDF (PDF, filesize: 2.72 MB), 3MF (3D Manufacturing File, filesize: 57.6 KB), IGE (IGES, filesize: 136 KB), STL (Stereolithography, filesize: 20.9 KB), STP (STEP, filesize: 123 KB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 2438
  • Vertices: 3374
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models
Spring Free 3D model
Add to Wishlist Remove from Wishlist View
HKS Hi-Power --- END PART ONLY Free 3D model
Add to Wishlist Remove from Wishlist View
Simple Greeble Cable Kitbash Free 3D model
Add to Wishlist Remove from Wishlist View
25 Sub-D Hard Surface Screw Heads Free 3D model
Add to Wishlist Remove from Wishlist View