Automatic Lifting Silo Module
Introduction
Introduction to the operation of the lifting silo module equipment:
- Put the first empty pallet into the lifting silo;
- Lift the hopper to the highest position to ensure that the height of the operator is about 900mm;
- Put it into the second pallet after it is full. Block an empty pallet; 4. Start the lifting function with the two- hand button, and the material bin will drop by a pallet height to ensure that the operator puts it in at a height of about 900mm, and so on...
File Formats
- Solidworks 2018 | Keyshot 10
- STEP (Standard for the Exchange of Product Data)
- IGES (Initial Graphics Exchange Specification)
- STL (Standard Tessellation Language )
- OBJ (Object Files)
Geometry
- Polygons: 11,974,724
- Vertice: 35,924,172
STL (Stereolithography, filesize: 571 MB), OBJ (OBJ, filesize: 1.02 GB), STP (STEP, filesize: 11.5 MB), IGE (IGES, filesize: 35.2 MB), SLDPRT (SolidWorks, filesize: 33.3 MB)