Boeing 727-200 Richards Aviation 3D model
Home Catalog Boeing 727-200 Richards Aviation 3D model

Publication date: 2014-12-22

Buy Boeing 727-200 Richards Aviation 3D model

$89

License: editorial_no_ai

author:

Dreamscape

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «Dreamscape». CGhub does not claim copyright ownership over the content used.
  • Description
Check out Boeing 727-200 Richards Aviation 3D model on CGTrader for $89. High-quality Polygon mesh mesh by Dreamscape: 32746 polys, 17843 vertices. Rigged, Textured, UV Mapped.

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 32746
  • Vertices: 17843
  • Geometry: Polygon mesh