cabinet cabinet wardrobe sofa bed table bookshelve 3D model buy
Home Catalog cabinet cabinet wardrobe sofa bed table bookshelve 3D model buy

Publication date: 2024-06-06

Buy cabinet cabinet wardrobe sofa bed table bookshelve 3D model buy

$9

License: Royalty Free

author:

smallyueyue

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «smallyueyue». CGhub does not claim copyright ownership over the content used.
  • Description
The "cabinet cabinet wardrobe sofa bed table bookshelve 3D model buy" is a 3D representation created by "Unknown author" for various digital applications. Download this asset at "Unknown platform" by following the link. The license for this digital asset is "Unknown license".

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 190119
  • Vertices: 196006
  • Plugins used
  • Geometry: Unknown
Similar models
Decorative set039 Free 3D model
Add to Wishlist Remove from Wishlist View
decorative set Vol005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative set 005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative molding 30-70mm width set Free 3D model
Add to Wishlist Remove from Wishlist View
Ornamental Free Free 3D model
Add to Wishlist Remove from Wishlist View
50 Ornament 3D Models Free 3D model
Add to Wishlist Remove from Wishlist View