The "Camping tent 3D model 6" 3D asset is currently listed under the authorship of "Unknown author".
Can be downloaded at "Unknown platform" by following the link.
Usage of this 3d asset is subject to the "Unknown license" agreement.
OBJ (OBJ, filesize: 1.55 MB), TEXTURES (Textures, filesize: 49.9 MB), MAX (Autodesk 3ds Max, filesize: 1.86 MB), FBX (Autodesk FBX, filesize: 6.86 MB)