cartoon building 3D model buy
Home Catalog cartoon building 3D model buy

Publication date: 2024-01-25

Buy cartoon building 3D model buy

$4

License: Royalty Free

author:

philipstephen912

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «philipstephen912». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats
This page contains free "cartoon building 3D model buy", which is a work by "Unknown author". Can be downloaded at "Unknown platform" by following the link. This specific 3D model is provided under the "Unknown license" framework.
OBJ (OBJ, filesize: 9.99 MB), FBX (Autodesk FBX, filesize: 5.47 MB), TEXTURES (Textures, filesize: 5 MB), PNG (PNG, filesize: 5 MB), GLTF (glTF, filesize: 1.63 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 7024
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models
Simple City Buildings Model Pack Free 3D model
pbr
Add to Wishlist Remove from Wishlist View
Fountain Free low-poly 3D model
realtime pbr
Add to Wishlist Remove from Wishlist View
Part of a house Free low-poly 3D model
realtime
Add to Wishlist Remove from Wishlist View
Lotus c4d fbx obj FREE Free 3D model
Add to Wishlist Remove from Wishlist View