ccc three airplane seats - three airplane seats Free 3D model
Home Catalog Military aircraft ccc three airplane seats - three airplane seats Free 3D model

Publication date: 2015-09-25

ccc three airplane seats - three airplane seats Free 3D model

free

License: Royalty Free No Ai License

author:

hlostoops

  • Description
  • Formats
Description

This 3D model was originally created with Sketchup 8 and then converted to all other 3D formats. Native format is .skp 3dsmax scene is 3ds Max 2016 version, rendered with Vray 3.00 ccc

Features

  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Unwrapped UVs: Unknown
  • Geometry: -
  • Polygons: 0
  • Vertices: 0
All content related to this 3D asset—including renders, descriptions, and metadata—is
credited to its original author, «hlostoops». CGhub does not claim copyright ownership over the content used.
  • 3D Studio ()16.7 KB
  • Collada ()34.4 KB
  • Autodesk FBX ()37.1 KB
  • IGES ()299 Bytes
  • Autodesk 3ds Max ()42.8 KB
  • OBJ () (2 files)15.9 KB
  • Sketchup ()79.9 KB
  • Stereolithography ()17.8 KB
  • Other 15.4 KB