Cinema project plan 2d and 3D Model 3D model
Home Catalog Cinema project plan 2d and 3D Model 3D model

Publication date: 2023-05-21

Buy Cinema project plan 2d and 3D Model 3D model

$2

License: Royalty Free

author:

Manicasihdy

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «Manicasihdy». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Cinema project plan 2d .dwg & 3D Model as .fbx export for autocad & 3dsMax in 3 sections.THIS 3DMODEL DOES NOT HAVE MATERIAL! ITS ONLY 2D PLAN ON AUTOCAD & 3DS MODELING IN 3DSMAX.NO UVW MAPPING AND TEXTURES!THANKS FOR YOUR ATTENTIONS.

FBX (Autodesk FBX, filesize: 29 MB), DWG (AutoCAD, filesize: 12.8 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Unknown
Similar models
Flanged Ball Valve Assembly Free 3D model
rig pbr
Add to Wishlist Remove from Wishlist View
3 JAW CHUCK  Free 3D model
Add to Wishlist Remove from Wishlist View
Metal Pipes Set 2 Free low-poly 3D model
realtime pbr
Add to Wishlist Remove from Wishlist View
Satellite Dish Free 3D model
Add to Wishlist Remove from Wishlist View
WW1 Factory Building Free low-poly 3D model
realtime
Add to Wishlist Remove from Wishlist View