Construction and lampposts 3D model
Home Catalog Construction and lampposts 3D model

Publication date: 2015-10-27

Buy Construction and lampposts 3D model

$2

License: Royalty Free No Ai

author:

marco-aurelio-o-m

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «marco-aurelio-o-m». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

This 3D model was originally created with Sketchup 8 and then converted to all other 3D formats. Native format is .skp 3dsmax scene is 3ds Max 2016 version, rendered with Vray 3.00 Plots of trees in the center of Aranjuez and the square of the light poles

STL (Stereolithography, filesize: 619 KB), OBJ (OBJ, filesize: 342 KB), 3DS (3D Studio, filesize: 463 KB), DAE (Collada, filesize: 800 KB), FBX (Autodesk FBX, filesize: 553 KB), IGE (IGES, filesize: 299 Bytes), MAX (Autodesk 3ds Max, filesize: 551 KB), SKP (Sketchup, filesize: 1.03 MB), OTHER (Other, filesize: 363 KB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models
 WeraJane Pinstripes Pear Lamp Model
pbr
Add to Wishlist Remove from Wishlist View
 Vintage Outdoor Sconce Model, Black
pbr
Add to Wishlist Remove from Wishlist View
 Round Wicker Bamboo Pendant Light Model  purchase
pbr
Add to Wishlist Remove from Wishlist View
 Clear Vintage Standard Light Bulb Model
pbr
Add to Wishlist Remove from Wishlist View