Gantt 6 3D model
Home Catalog Gantt 6 3D model

Publication date: 2023-10-24

Buy Gantt 6 3D model

$13

License: Royalty Free

author:

Level3D

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «Level3D». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Z-Lite Gantt 6 Light 41-1/2Wide Linear Chandelier with Seedy Glass Shade and (6) 12, (2) 6, and (2) 3 downrods

https://www.build.com/z-lite-3002-42/s1422537?uid=3345613&source=ptrshp_3345613&displaypla=true&epik=dj0yJnU9QjhpNHZ2MTZiMVVabnM5dENKTThQTkFWNGVQd19Ic2smcD0wJm49TkZfdFBnVTUtZWE1eFZVSllPc2J5QSZ0PUFBQUFBR0V4X3Iw

OBJ (OBJ, filesize: 25.7 MB), MAT (mat, filesize: 64 KB), FBX (Autodesk FBX, filesize: 2.7 MB), 3DS (3D Studio, filesize: 1.44 KB), MAX (Autodesk 3ds Max, filesize: 14 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models
 WeraJane Pinstripes Pear Lamp Model
pbr
Add to Wishlist Remove from Wishlist View
 Vintage Outdoor Sconce Model, Black
pbr
Add to Wishlist Remove from Wishlist View
 Round Wicker Bamboo Pendant Light Model  purchase
pbr
Add to Wishlist Remove from Wishlist View
 Clear Vintage Standard Light Bulb Model
pbr
Add to Wishlist Remove from Wishlist View