indoor swimming pool 3D model purchase
Home Catalog indoor swimming pool 3D model purchase

Publication date: 2023-01-08

Buy indoor swimming pool 3D model purchase

$25

License: Royalty Free

author:

renderstudioarchviz

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «renderstudioarchviz». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats
The "indoor swimming pool 3D model purchase" is a free digital file created and uploaded by "Unknown author". Can be downloaded at "Unknown platform" by following the link. The licensing terms for this digital asset are governed by "Unknown license".
MAX (Autodesk 3ds Max, filesize: 81.5 MB), TEXTURES (Textures, filesize: 698 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 98983
  • Vertices: 89988
  • Plugins used
  • Geometry: Polygon mesh
Similar models
 WeraJane Pinstripes Pear Lamp Model
pbr
Add to Wishlist Remove from Wishlist View
 Vintage Outdoor Sconce Model, Black
pbr
Add to Wishlist Remove from Wishlist View
 Round Wicker Bamboo Pendant Light Model  purchase
pbr
Add to Wishlist Remove from Wishlist View
 Clear Vintage Standard Light Bulb Model
pbr
Add to Wishlist Remove from Wishlist View