All content related to this 3D asset—including renders, descriptions, and metadata — is
credited to its original author, «ksvkumar7». CGhub does not claim copyright ownership over the content used.
Description
Formats
Model Designed by using Solidworks CAD Software and Rendered
SLDPRT (SolidWorks, filesize: 1.21 MB), OTHER (Other, filesize: 507 KB)