JONATHAN Y Lighting is a high-quality, photo-realistic 3d model that will enhance your rendering projects' detail and realism. The model has a fully textured, detailed design that allows for close-up renders, and was modeled in 3ds Max 2018 and has a 3ds Max 2015 version, and rendered with V-Ray. Renders have no post-processing.
Features:
- High-quality polygonal model.
- Maintained real-world scale.
- Models have Turbosmooth Modifier applied, so the resolution can be increased or decreased.
- Model is fully textured with all materials applied.
- All colors can be easily modified.
- All textures and materials are included.
- No 3rd-Party Plugin needed to open the Scene.
- Correctly Rename: Objects, Groups, and Layers
- So, no cleaning necessary, just drop the models into your scene and start rendering.
- Units used - centimeters [cm]
File Formats:
- 3ds Max 2020 V-Ray 5
- 3ds Max 2018 PBR
- 3ds Max 2018 V-Ray 3.6
- 3ds Max 2015 V-Ray 3.6
- Blender 2.80 Cycles PBR
- 3DS
- OBJ
- FBX
- DWG
Glb - (If you need more optimized model for e-commerce and web AR. please contact us with your custom request.)
Gltf - (If you need more optimized model for e-commerce and web AR. please contact us with your custom request.)
Usdz - (If you need more optimized model for e-commerce and web AR. please contact us with your custom request.)
Feel free to leave your opinion in comments and check out my other models just click on our username to see complete gallery.3dxin
STL (Stereolithography, filesize: 2.72 MB), OBJ (OBJ, filesize: 5.22 MB), MAX (Autodesk 3ds Max, filesize: 7.14 MB), OTHER (Other, filesize: 5.63 MB), FBX (Autodesk FBX, filesize: 5.19 MB), GLTF (glTF, filesize: 5.85 MB), BLEND (Blender, filesize: 10.2 MB), 3DS (3D Studio, filesize: 1.46 MB), TEXTURES (Textures, filesize: 40.3 MB), PNG (PNG, filesize: 40.3 MB), DAE (Collada, filesize: 8.38 MB)