Log Cabin Painted 3D model
Home Catalog Log Cabin Painted 3D model

Publication date: 2021-09-06

Buy Log Cabin Painted 3D model

$39

License: Royalty Free

author:

artsoul

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «artsoul». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

The 3D model of Painted Log Cabin with a nice details.

Includes the interior walls, doors and stairs.

The model is textured. All textures are included.

The colors can be modified.

The house modeled to real world scale.

I hope you like it and hope the model will serve your needs.

Available in obj, fbx, blend, stl formats.

Vertices 1 228 137

Faces 929 047

Please like it and leave comment.

Please check the other models on my profile page.

BLEND (Blender, filesize: 2.06 GB), OBJ (OBJ, filesize: 166 MB), FBX (Autodesk FBX, filesize: 1.57 GB), STL (Stereolithography, filesize: 115 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 929047
  • Vertices: 1228137
  • Geometry: Polygon mesh
Similar models