MS-01-METHOD STATEMENT OF TEMPORARY WORKS 3D MODEL 3D model
Home Catalog MS-01-METHOD STATEMENT OF TEMPORARY WORKS 3D MODEL 3D model

Publication date: 2021-08-08

Buy MS-01-METHOD STATEMENT OF TEMPORARY WORKS 3D MODEL 3D model

$12.75

License: Content published with the label may not be sold, given, or assigned to another person or entity in the form it is downloaded from the site.

author:

HCN

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «HCN». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

METHOD STATEMENT OF TEMPORARY WORKS FOR CIRCULAR HOLLOW SECTION AND REINFORCEMENT 3D VIEW REVIT

Technical detail:

Originally modelled: Revit 2020 and above

Model: correctly scaled

Formats: Revit 2020 and above

Native Formats: RFA (Autodesk Revit, filesize: 11.4 MB) Exchange Formats: FBX (Autodesk FBX, filesize: 72.3 MB), DWG (AutoCAD, filesize: 7.98 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Unknown
Similar models
Flanged Ball Valve Assembly Free 3D model
rig pbr
Add to Wishlist Remove from Wishlist View
3 JAW CHUCK  Free 3D model
Add to Wishlist Remove from Wishlist View
Metal Pipes Set 2 Free low-poly 3D model
realtime pbr
Add to Wishlist Remove from Wishlist View
Satellite Dish Free 3D model
Add to Wishlist Remove from Wishlist View
WW1 Factory Building Free low-poly 3D model
realtime
Add to Wishlist Remove from Wishlist View