public park-Private Park Landscape -Park Center 3D model buy
Home Catalog public park-Private Park Landscape -Park Center 3D model buy

Publication date: 2025-12-12

Buy public park-Private Park Landscape -Park Center 3D model buy

$7

License: Royalty Free

author:

azhaco2022

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «azhaco2022». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

landscaping park

Private Park Landscape-design for different environments and spaces which you can use in different formats.

format:

max. obj. lum. rev. skp. fbx. stl. cad. dwf. 3ds. jpg

These products are rendered in the program lumion and have the smallest possible details that you can use in your work.

STL (Stereolithography, filesize: 522 MB), OBJ (OBJ, filesize: 522 MB), JPG (JPG, filesize: 522 MB), 3DS (3D Studio, filesize: 522 MB), DWG (AutoCAD, filesize: 522 MB), DXF (DXF, filesize: 522 MB), FBX (Autodesk FBX, filesize: 522 MB), SKP (Sketchup, filesize: 522 MB), WRL (VRML, filesize: 522 MB), MAX (Autodesk 3ds Max, filesize: 522 MB), LS11 (Lumion, filesize: 522 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Plugins used
  • Geometry: Polygon mesh
Similar models
Fisher Boat Free low-poly 3D model
realtime
Add to Wishlist Remove from Wishlist View
Knuckle Crane Free 3D model
Add to Wishlist Remove from Wishlist View
Baby powder Free 3D model
Add to Wishlist Remove from Wishlist View