The Real Bridge is the fourth bridge to be built in the city of Badajoz. It was opened in December 1994 after two years of works and since their Majesties the King and Queen of Spain put the first stone of the work in September 1992.
STL (Stereolithography, filesize: 3.27 KB), OBJ (OBJ, filesize: 6.21 KB), 3DS (3D Studio, filesize: 5.95 KB), FBX (Autodesk FBX, filesize: 15.2 KB), IGE (IGES, filesize: 300 Bytes), MAX (Autodesk 3ds Max, filesize: 23.8 KB), SKP (Sketchup, filesize: 231 KB), OTHER (Other, filesize: 5.42 KB)