Red Latin Hacienda Modern Villa 3D model 3D model
Home Catalog Red Latin Hacienda Modern Villa 3D model 3D model

Publication date: 2019-02-06

Buy Red Latin Hacienda Modern Villa 3D model 3D model

$40

License: Royalty Free

author:

cloexyz

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «cloexyz». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Here is a very realistic 3d Model Luxury House set. Custom maid. There was a lot of attention to detail. Geometry is solid and well planed. You get the V-Ray Scene plus the default scanlinescene. It includes textures and all. Also FBX, DWG, STL and OBJ files. Great for interior renderings. This is a really nice piece can be reused on other works. Hope you enjoy it.

MAX (Autodesk 3ds Max, filesize: 94 MB), OBJ (OBJ, filesize: 90.9 MB), FBX (Autodesk FBX, filesize: 88.2 MB), 3DS (3D Studio, filesize: 89.6 MB), DWG (AutoCAD, filesize: 88.8 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 36475
  • Vertices: 40708
  • Plugins used
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models