small house design Free 3D model
Home Catalog small house design Free 3D model

Publication date: 2021-04-05

Download small house design Free 3D model

free

License: Royalty Free No Ai Html

author:

Teen-Wolf

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «Teen-Wolf». CGhub does not claim copyright ownership over the content used.
  • Description

the model is based on eastern architecture having two bedrooms with attached bathrooms a kitchen , drawing , backyard adn guest area with one bedroom and a one WC.all the interrior solutions are done accordingly. along with furniture

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Unknown
Similar models
Decorative set039 Free 3D model
Add to Wishlist Remove from Wishlist View
decorative set Vol005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative set 005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative molding 30-70mm width set Free 3D model
Add to Wishlist Remove from Wishlist View
Ornamental Free Free 3D model
Add to Wishlist Remove from Wishlist View
50 Ornament 3D Models Free 3D model
Add to Wishlist Remove from Wishlist View