Spherical Pattern Symmetry Low-poly 3D model
Home Catalog Spherical Pattern Symmetry Low-poly 3D model

Publication date: 2020-04-11

Buy Spherical Pattern Symmetry Low-poly 3D model

$15

License: Royalty Free

author:

5555nkt

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «5555nkt». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Spherical Pattern Symmetry

Materials, scene and lightning were made in the Blender.

FILE FORMATS:

  • Native format – .blend (Blender 3D Data File)
  • .stl (Stereolithography)
  • .dae (Collada (Default))
  • .abc (Alembic)
  • .3ds (3D Studio)
  • .fbx (Autodesk FBX)
  • .ply (Polygon File Format)
  • .obj (Wavefront)
  • .mtl (OBJ Material Template Library File)
  • .x3d (X3D Extensible 3D)
  • .blend1 (a .blend file backup)

3D MODEL DETAILS:

  • Animated - No
  • Rigged - No
  • VR/AR/Low-Poly - Yes
  • PBR - Yes
  • Geometry - Polygon Mesh
  • Polygons - 168,961
  • Vertices - 168,844
  • Textures - No
  • Materials - Yes
  • UV Mapping - No
  • Plugins Used - No

MATERIALS:

Materials for this 3D model are made in the Blender.

If you need to change the size of the model or change anything in it, you can upload it to any 3D package and scale it as you like (many formats are included, such as: .dae, .obj, .fbx, etc.) or you can do it in your software that supports 3D model formats. Preview images are rendered in Cycles Render.

I am happy to answer any questions you might have about the model.

Native Formats: BLEND (Blender, filesize: 14.6 MB) Exchange Formats: OBJ (OBJ, filesize: 18.1 MB), FBX (Autodesk FBX, filesize: 6.15 MB), ABC (Alembic, filesize: 12.9 MB), DAE (Collada, filesize: 22.3 MB), 3DS (3D Studio, filesize: 325 Bytes), STL (Stereolithography, filesize: 16.1 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 168961
  • Vertices: 168844
  • Geometry: Unknown
Similar models
Decorative set039 Free 3D model
Add to Wishlist Remove from Wishlist View
decorative set Vol005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative set 005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative molding 30-70mm width set Free 3D model
Add to Wishlist Remove from Wishlist View
Ornamental Free Free 3D model
Add to Wishlist Remove from Wishlist View
50 Ornament 3D Models Free 3D model
Add to Wishlist Remove from Wishlist View