Synergistic Martian Dwellings - Regional Ecosystem Integration 3D model
Home Catalog Synergistic Martian Dwellings - Regional Ecosystem Integration 3D model

Publication date: 2025-06-25

Buy Synergistic Martian Dwellings - Regional Ecosystem Integration 3D model

$20

License: Royalty Free

author:

azhaco2022

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «azhaco2022». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

This 3D model showcases a visionary concept for sustainable human habitation on Mars. It depicts a cluster of habitat units designed not just for survival, but for active integration with the local Martian environment (regional ecology). The design utilizes in-situ resources like regolith for radiation shielding and structural components. Key features include interconnected pressurized bio-domes for controlled agriculture and atmosphere recycling, subsurface living quarters for thermal stability and protection, and advanced systems for harvesting and processing local water ice and minerals. The layout emphasizes creating a closed-loop ecosystem within the harsh Martian terrain, representing a crucial step towards long-term, self-sustaining colonization.

format:

max. obj. lum. rev. skp. fbx. stl. cad. dwf. 3ds. jpg

These products are rendered in the program and have the smallest possible details that you can use in your work.

The 3D model you see is elegant and accurate and you can use it in different outputs. Thank you for giving a positive opinion to my models.

STL (Stereolithography, filesize: 137 MB), OBJ (OBJ, filesize: 137 MB), 3DS (3D Studio, filesize: 137 MB), DAE (Collada, filesize: 137 MB), DWG (AutoCAD, filesize: 137 MB), DXF (DXF, filesize: 137 MB), FBX (Autodesk FBX, filesize: 180 MB), SKP (Sketchup, filesize: 137 MB), WRL (VRML, filesize: 137 MB), JPG (JPG, filesize: 137 MB), LS10 (Lumion, filesize: 137 MB), MAX (Autodesk 3ds Max, filesize: 137 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Plugins used
  • Geometry: No N-gons | No faceted geometry | Manifold geometry |
Similar models