Ukrainian Trident 3D print model 19
Home Catalog Ukrainian Trident 3D print model 19

Publication date: 2022-11-16

Buy Ukrainian Trident 3D print model 19

$20

License: Royalty Free

author:

Allex-3d

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «Allex-3d». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats
The "Ukrainian Trident 3D print model 19" is a free digital file created and uploaded by "Unknown author". You can download this asset for free at "Unknown platform" by following the link. The license for this digital asset is "Unknown license".
Native Formats: 3DM (Rhinoceros 3D, filesize: 4.59 MB) Exchange Formats: OBJ (OBJ, filesize: 3.4 MB), STL (Stereolithography, filesize: 4.81 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Unknown
Similar models
Decorative set039 Free 3D model
Add to Wishlist Remove from Wishlist View
decorative set Vol005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative set 005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative molding 30-70mm width set Free 3D model
Add to Wishlist Remove from Wishlist View
Ornamental Free Free 3D model
Add to Wishlist Remove from Wishlist View
50 Ornament 3D Models Free 3D model
Add to Wishlist Remove from Wishlist View