Vesuvio E Chandelier 1 1 8 601 G 3D model
Home Catalog Vesuvio E Chandelier 1 1 8 601 G 3D model

Publication date: 2019-11-13

Buy Vesuvio E Chandelier 1 1 8 601 G 3D model

$8

License: Royalty Free

author:

listudio220

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «listudio220». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

Vesuvio E Chandelier 1.1.8.601 G

Height: 55 Diameter: 65 Light source: E14 - 8 PCs Color: Gold Features: Crystal, metal

Vray 3.6 gtr(ggx) http://www.sferon.ru/

Native Formats: MAX (Autodesk 3ds Max, filesize: 18.2 MB) Exchange Formats: OBJ (OBJ, filesize: 39.8 MB), FBX (Autodesk FBX, filesize: 29.3 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 185514
  • Vertices: 170005
  • Plugins used
  • Geometry: Unknown
Similar models
Decorative set039 Free 3D model
Add to Wishlist Remove from Wishlist View
decorative set Vol005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative set 005 Free 3D model
Add to Wishlist Remove from Wishlist View
Decorative molding 30-70mm width set Free 3D model
Add to Wishlist Remove from Wishlist View
Ornamental Free Free 3D model
Add to Wishlist Remove from Wishlist View
50 Ornament 3D Models Free 3D model
Add to Wishlist Remove from Wishlist View