Welding Project Plans Drawings Fire Pit 2 DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Fire Pit 2 DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Fire Pit 2 DXF PDF 3D model

$41

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder).

Please note that the drawings are distributed on the condition that your finished product is a finished fire pit, the sale of welding kits based on my drawings is strictly prohibited.

Monumental and simple firepit. Of all the firepits that I have ever designed, on my own behalf or for someone else, I would choose this one for myself. This project does not save material, so you are unlikely to make it from stainless steel, rather ordinary structural steel and heat-resistant paint.

The project involves 6 mm steel. The total weight of the assembly is 130 kg. I will try to make the following projects less massive. Overall dimensions are 706x700x350. A welded bottom for falling coal and ash is provided under the sheet metal grate, the distance between the petals is 29mm. There is also a second version of firepit, which is also included in the project, it has through holes.

This digital product is not for distribution (dxf, PDF), it is intended for you and your production.

Please note that the drawings are distributed on the condition that your finished product is a finished fire pit, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

PDF (PDF, filesize: 2.57 MB), DXF (DXF, filesize: 5.15 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models