Welding Project Plans Drawings Fire Pit 4 DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Fire Pit 4 DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Fire Pit 4 DXF PDF 3D model

$85

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder).Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

A new project of a Fire Pit with a brazier and a grill grate.

Made from 3mm steel. Cut out the grill grate from stainless steel.

All parts are positioned among themselves “thorn-groove”. A bending machine is not needed for manufacturing. To facilitate transportation, the fire pit is disassembled into several parts. The total weight of the structure is approximately 117 kg. The following fasteners are required for assembly: DIN 933 – M8x25 (16 pcs.), DIN 934 – M8 (16 pcs.), DIN 9021 – M8 (32 pcs.). The project includes: dxf (19 pcs.), Drawings (8 pages), assembly instructions (13 pages).

This digital product is not for distribution (dxf, PDF), it is intended for you and your production.

Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

PDF (PDF, filesize: 1.68 MB), DXF (DXF, filesize: 3.37 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models