Welding Project Plans Drawings Fire Pit 5 DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Fire Pit 5 DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Fire Pit 5 DXF PDF 3D model

$37

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder).Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Steel Sheet Metal Drawings Plans Pattern Template Fire Pit 5 Project Sculpture (dxf, PDF)The new fire pit is designed to be made from 6mm steel, and the bottom plates from 3mm steel. Part bending is not required. 35 parts in 6mm steel, bottom two plates in 3mm steel. If necessary, I can change the thickness of the parts to the required one. The weight of the fire pit with the specified metal thickness is 61 kg. The project includes: dxf (4 pcs.), Drawings (2 pages), assembly instructions (5 pages).

This digital product is not for distribution (dxf, PDF), it is intended for you and your production.

Please note that the drawings are distributed on the condition that your finished product is a finished fire pit, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

PDF (PDF, filesize: 898 KB), DXF (DXF, filesize: 1.75 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models