Welding Project Plans Drawings Fire Pit 6 DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Fire Pit 6 DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Fire Pit 6 DXF PDF 3D model

$44

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder).Please note that the drawings are distributed on the condition that your finished product is a finished fire pit, the sale of welding kits based on my drawings is strictly prohibited.

The fire pit is designed to be made from 6mm steel. Part bending is not required. 20 parts in total. The weight of the fire pit with the specified metal thickness is 55 kg. The project includes: dxf (5 pcs.), Drawings (1 pages), assembly instructions (4 pages).

Parts do not require bending.

The files you download are not intended for distribution (in any form, digital or printed), they are intended for you and your production. You have the right to manufacture and sell products created according to these drawings (only finished sculpture) in any quantities.

3D models are not included in the project, if you need, then STP models of all parts, except for mirror parts, (not assembled) can be provided for an additional fee.

Please note that the drawings are distributed on the condition that your finished product is a finished fire pit, the sale of welding kits based on my drawings is strictly prohibited.

The photo shows an example of a smaller version.

Thank you and good luck with your work!

DXF (DXF, filesize: 854 KB), PDF (PDF, filesize: 1.67 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models