Welding Project Plans Drawings Skull Fire Pit DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Skull Fire Pit DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Skull Fire Pit DXF PDF 3D model

$123

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder). Also, you should be able to bend the parts on a bending machine or manually, at the end welding the parts together according to the instructions and, if desired, cleaning and painting the finished product.Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Fire Pit skull involves the manufacture of steel with a thickness of 1.5 mm and a bending radius of 1 mm. But this is the minimum thickness of the metal, if you make it thinner, the metal can bend under the influence of temperature, you can use even thicker metal, for example 2mm, see the thickness in the drawing. The lower grille is not welded and is a flat piece without bends, it must be made of 3mm steel. The weight of the fire pit is about 16 kg. There are 30 parts in total. The design documentation includes 22 pages, 17 of which are bending drawings. The instruction includes 12 pages in the order of assembly. The bend line is drawn along the cutouts in the part, in accordance with the drawing.The archive includes: dxf (20 pcs.- files separately), Drawings (22 pages), Instructions (12 pages).

There is no engraving on the dxf, bending is performed along the line indicated by drop-shaped cutouts at the ends of the bending line.

If you need to create a stencil for printing in PDF format or create a DXF file with all the parts located on the sheet metal format you need, please contact me.

This digital product is not for distribution (dxf, PDF), it is intended for you and your production.

Please note that the drawings are distributed on the condition that your finished product is a finished sculpture, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

DXF (DXF, filesize: 3.21 MB), PDF (PDF, filesize: 6.42 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models