Welding Project Plans Drawings Stove 1 DXF PDF 3D model
Home Catalog Welding Project Plans Drawings Stove 1 DXF PDF 3D model

Publication date: 2024-07-25

Buy Welding Project Plans Drawings Stove 1 DXF PDF 3D model

$62

License: Custom

author:

taburkin

All content related to this 3D asset—including renders, descriptions, and metadata — is credited to its original author, «taburkin». CGhub does not claim copyright ownership over the content used.
  • Description
  • Formats

All questions regarding the project can be asked in direct instagram (@ta6urkin) or by e-mail (ta6urkin@gmail.com)

The 3D model is not included in the project.

This is a digital product (there is no physical product) intended for the independent production of sheet metal products. You should be able to cut out parts on a CNC metal cutting machine or manually with a convenient cutting tool using a stencil (for example, a grinder). Also, you should be able to bend the parts on a bending machine or manually, at the end welding the parts together according to the instructions and, if desired, cleaning and painting the finished product.Please note that the drawings are distributed on the condition that your finished product is a finished stove, the sale of welding kits based on my drawings is strictly prohibited.

The Stove involves the manufacture of steel with a thickness of 3 mm and a bending radius of 3 mm. The weight of the stove is about 53 kg. There are 41 parts in total (not counting standard purchased parts). The design documentation includes 22 pages. The instruction includes 17 pages in the order of assembly. The archive includes: dxf (21 pcs.- files separately), Drawings (22 pages), Instructions (17 pages). Overall dimensions of the stove (LxWxH): 1082х500х536.

In addition to sheet metal, you also need a ⌀100×1.5 pipe for the chimney, two welded hinges, a set of fasteners (M8 bolts and nuts).

DXF are available both in the form of parts separately, and placed for a sheet of metal with a size of 2500x1250mm, 3000x1500mm.

If you need to create a stencil for printing in PDF format or create a DXF file with all the parts located on the sheet metal format you need, please contact me.

The files you download are not intended for distribution (in any form, digital or printed), they are intended for you and your production. You have the right to manufacture and sell products created according to these drawings (only finished stove) in any quantities.

3D models are not included in the project, if you need, then STP models of all parts, except for mirror parts, (not assembled) can be provided for an additional fee. But I do not guarantee that your bending calculation software will display the models correctly.

Please note that the drawings are distributed on the condition that your finished product is a finished stove, the sale of welding kits based on my drawings is strictly prohibited.

Thank you and good luck with your work!

DXF (DXF, filesize: 5.56 MB), PDF (PDF, filesize: 11.1 MB)

3D Model details

  • cgtrader Platform
  • Animated
  • Rigged
  • Ready for 3D Printing
  • VR / AR / Low-poly
  • PBR
  • Textures
  • Materials
  • UV Mapping
  • Polygons: 0
  • Vertices: 0
  • Geometry: Other
Similar models