Modern Hair Salon Styling Chair Collection 3D - PBR Textures 3D model
Home Catalog Modern Hair Salon Styling Chair Collection 3D - PBR Textures 3D model

Publication date: 2025-09-26

Buy Modern Hair Salon Styling Chair Collection 3D - PBR Textures 3D model

$19

License: Royalty Free No Ai

Rigged PBR Realtime Animated Free
author:

jadenkhanroberpr

Renders and source materials belong to the author jadenkhanroberpr.
Specifications
Platform
cgtrader
Animated
✕
Rigged
✕
3D Print ready
✕
VR / AR / Low-poly
✕
PBR
✕
Textures
✓
Materials
✓
UV Mapping
✓
Polygons
999
Vertices
999
Geometry
Unknown
Plugins used
✓
Usage recommendations
Realtime rendering ✕
PC Game development ✕
Mobile Game Development ✕
VR/AR applications ✕
Visualisation ✓
Cinema ✓
Advertising ✓
3D Printing ✕
CAD Engineering ✕
E-Commerce & Interactive 3D Web ✕
FAQ
Is this a free 3D model?

No, this model costs $19.

How do I download this 3D model?

Use the "Go to purchase" button below to get this model.

What license applies to this model?

This model is distributed under the Royalty Free No Ai license. Click "Go to purchase" for full license details.

Does it include rigging and animation?

This model has no rig or animation. It is a static 3D object.

Does this model have UV mapping?

Yes, this model has UV mapping. Technical details are in the Specifications block, and a fuller description is in Additional information.

What textures and materials does this 3D model include?

This model has textures and materials. Technical details are in the Specifications block, and a fuller description is in Additional information.

Can I use it for 3D printing?

No, this model is not intended for 3D printing.

Additional information
Modern Barber Shop - 3D Model & Scene

This is a highly detailed and fully customizable 3D model of a modern, stylish barber shop interior. It's perfect for architectural visualization, animation, game development, virtual reality experiences, and advertising renders. The scene is designed with a clean, masculine aesthetic, featuring classic barber elements with a contemporary twist.

The model is complete with all furniture, props, and lighting setups, making it ready to render straight out of the box. Every object is logically named and grouped for easy management and integration into your projects.

Key Features:

High-Quality Models: All models are created with clean topology and are ready for use in close-up renders.

Fully Furnished Scene: Includes everything you see in the preview images: barber chairs, waiting area sofa, reception desk, shelving units, mirrors, and much more.

Realistic Materials & Textures: Features PBR materials (Metallic-Roughness workflow) for realistic lighting and rendering. High-resolution textures are included (e.g., 4K for key assets).

Optimized for Rendering: The scene is set up with default lighting (V-Ray/Corona/Octane/etc.) to achieve the look shown in the previews quickly.

Detailed Props: Includes a wide range of props to bring the scene to life: hair clippers, scissors, combs, product bottles, magazines, and decorative items.

Easy to Customize: All elements are separate objects, allowing you to easily hide, move, or modify them to suit your specific needs.

File Formats:

3ds Max 2020 + V-Ray 7

FBX + OBJ

Blender 4

C4D 2025

Maya 2025
Similar models
Volvo S90 Free 3D model
pbr
Add to Wishlist Remove from Wishlist View
Nissan Skyline R34 - Blue Free 3D model
Add to Wishlist Remove from Wishlist View
Tesla Model S All Colors High Quality Free 3D model
Add to Wishlist Remove from Wishlist View