This 3D model was originally created with Sketchup 8 and then converted to all other 3D formats. Native format is .skp 3dsmax scene is 3ds Max 2016 version, rendered with Vray 3.00 ccc
STL (Stereolithography, filesize: 17.8 KB), OBJ (OBJ, filesize: 15.9 KB), 3DS (3D Studio, filesize: 16.7 KB), DAE (Collada, filesize: 34.4 KB), FBX (Autodesk FBX, filesize: 37.1 KB), IGE (IGES, filesize: 299 Bytes), MAX (Autodesk 3ds Max, filesize: 42.8 KB), SKP (Sketchup, filesize: 79.9 KB), OTHER (Other, filesize: 15.4 KB)